Where conversions succeed and stall
The donated-space pattern decides most projects. Successful conversions usually annex an adjacent closet or borrow a slice of a neighboring room, putting the new bathing zone on the donated side and leaving the existing fixtures roughly in place; this keeps the original drain logic while concentrating new work in one corner. Conversions that rearrange everything inside the original walls pay renovation prices for half-bath geometry.
Drainage is the classic stall: bathing drains want diameter, fall, and venting the half bath never provisioned, and the route from the new zone to the existing system is the project's price core. Floor structure follows, especially for curbless ambitions that need recess depth; and the quiet capacity questions, hot water for a new daily shower, electrical for fan and lighting, surface in the second week of planning where they are cheap, or the second week of construction where they are not.
Scope honesty finishes the picture: a conversion is a wet-area construction project, waterproofing, ventilation, and inspection included, compressed into a small room. Downtime resembles a small full renovation, and the second bathroom's existence is what makes it tolerable. Priced and planned that way, conversions rank among the highest-function additions a home can make: a full bath where the floor plan needed one.