| Existing layout | Moving a toilet, shower, tub, or vanity can affect plumbing, wiring, framing, floor repair, reviews, and inspections. | Compare a measured same-layout option with any proposed reconfiguration. |
|---|
| Wet-area system | Receptor or tub, drain, substrate, waterproofing, valves, walls, glass, transitions, accessories, and testing all add dependencies. | Name the complete assembly and where surrounding repair begins and ends. |
|---|
| Demolition and concealed conditions | Water damage, unsuitable substrate, older wiring or plumbing, access, and structural findings may appear after demolition. | Document assumptions and the approval process for discoveries and changed work. |
|---|
| Cabinetry, countertop, and storage | Cabinet construction, finish, fabrication, sinks, faucets, backsplash, mirror, and lighting relationships affect labor and lead time. | Confirm dimensions, allowances, selections, delivery, and installation responsibility. |
|---|
| Tile and finish quantity | Area, pattern, size, cuts, edges, niches, benches, grout, preparation, transitions, and waste matter alongside material price. | Review drawings, quantities, layout points, edge profiles, and substrate preparation. |
|---|
| Plumbing, electrical, lighting, and ventilation | Valves, drains, supply lines, outlets, circuits, controls, fans, ducts, and terminations can expand trade and review scope. | Identify each trade, rough-in location, test, review, and close-in milestone. |
|---|
| Glass and specialty fabrication | Custom glass, stone, cabinetry, mirrors, and specialty products depend on field dimensions, lead time, storage, and coordinated installation. | State who measures, orders, receives, inspects, stores, and installs every fabricated item. |
|---|
| Permits, access, and logistics | Address-level reviews, access, stairs, parking, work hours, protection, staging, debris, shutdowns, and another-bathroom needs shape the operating plan. | Confirm responsibilities and constraints for the actual address and scope. |
|---|